"Occupied Campus" Projects Require Special Care

When a client’s business must continue as usual during a construction project, thorough planning and constant communication are imperative to ensure safety and success.

By Ricky Touchstone -- Associated Construction Publications, 4/3/2008

Most organizations, whether they are hospitals, colleges, private schools, retirement homes, or churches, want their construction projects to take place with the least amount of disruption possible. Making that happen, however, can be a daunting challenge for a commercial contractor. Allowing the client to conduct "business as usual" during a major construction project requires careful coordination that allows access while at the same time thoroughly protecting the safety of everyone involved.

Over its 85-year history, Frank L. Blum Construction Company has become something of a specialist in "occupied campus" projects. These projects have included:

  • Complex renovations at Wake Forest University Baptist Medical Center. Patient rooms continued to be occupied and surgery proceeded in treatment rooms just yards away from active construction areas.
  • Student center at High Point University. The cafeteria and bookstore remained open throughout construction.
  • Private schools and retirement homes. Young students and residents continued with their routines while Blum personnel answered their questions and ensured their safety.

Keys To Successful Occupied Campus Projects

The commonality to the success of all these projects is thorough pre-planning; persistent, ongoing, clear communication with the client; and constant attention to details. There is no substitute for thorough planning and daily dialogue that addresses the clients’ concerns and prevents potential problems. All Blum field supervisors, employees and subcontractors know that this element of their job is every bit as important as the actual construction work.

Wake Forest UniversityWake Forest University Baptist Medical Center

During construction projects in health care facilities, additional issues such as controlling construction dust prove challenging. In some cases, patients may be in rooms on the other side of a temporary construction wall while work is continuing. At no other facility is it as imperative that safety rules be strictly followed and that electrical, sprinkler and HVAC systems be shut off only for the minimum amount of time necessary. At Wake Forest University Baptist Medical Center, Blum’s work on site is preceded by extensive planning meetings in order to phase the job properly to reduce disruption. Close communication with nurses and physicians is necessary to determine when patients must be moved to different areas.

Student Center – High Point University

At High Point University, Blum’s assignment was to construct a 45,000-square-foot addition to the student center during the college’s 2007 academic year. The university requested that the center stay open, even though students would have to pass through the job site in order to check their mail, browse in the bookstore or eat in the cafeteria. The job required knocking down an existing brick exterior wall and removing brick pavers on what had been an outdoor terrace area.

To ensure the students’ safety, Blum constructed a plywood tunnel to allow access through the site and walled off the rest of the site with chain link fence panels. But as you might expect, college students were in the habit of taking their normal route through campus. Fortunately the university’s graphics department assisted Blum with signage that, in addition to the careful attention of Blum workers on site, kept the problem contained and prevented any injuries.

Summit School

During Blum’s numerous projects over the years at Summit School in Winston-Salem, teachers and students have had to routinely walk around job sites in order to get from building to building or to the parking lot and playground. Blum has erected temporary fencing and poured temporary sidewalks that directed the children away from the job sites and worked with the school to educate teachers and parents about the new pathways.

Of course, the students’ curiosity must and should be accommodated as well. Blum superintendents have conducted tours for families, faculty and staff, and donors; visited classrooms; and answered, in writing, questions written on pieces of paper stuck into the fence! Blum’s newest project at the school involves the inclusion of "green" building techniques, and the staff is actively working with the teachers to take full advantage of this opportunity to teach students about construction that has a minimal impact on the environment.

Cross Road Retirement Community

Cross Road Retirement CommunitySatisfying curiosity is also a major factor in projects at retirement homes, where construction work can be a source of daily intrigue for residents who feel an ownership of their surroundings. Blum is always aware that during these projects the staff is in the residents’ home. With this unique population, great care and vigilance on behalf of all workers at the site is also necessary to ensure that residents stay within the safe zones.

Blum also seeks to minimize disruption in the living areas as much as possible. At Cross Road Retirement Community in Asheboro, N.C., Blum minimized workers’ foot traffic through the facility by building a temporary stair/scaffolding structure with a plank walkway across the roof of the main building. This allowed workers to climb up, over and down to the job site in an enclosed inner courtyard without walking through the hallways most of the time.

Using this structure to get construction materials into the courtyard was a major challenge at times. The management of Cross Road appreciated the fact that Blum went above and beyond the usual practices to make sure residents were disturbed as little as possible.

Working on an occupied campus is not simple, and these measures must be taken while still adhering to an often rigorous construction schedule. Blum clients say they appreciate the extensive planning and the way that Blum employees look out for them.

Any inconveniences Blum experiences in the short run are far outweighed by the long-term rewards, with many satisfied customers asking the company to return again and again.


Ricky Touchstone is a partner and senior project manager with Frank L. Blum Construction Co. in Winston-Salem, North Carolina.

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

There are no other articles related to this article.

By This Author

There are no other articles written by this author.

Sponsored Links

 
Advertisement
Click Go for full forecast

More Content

  • Blogs
  • Photos

Blogs

  • Loren Faulkner
    California Builder and Engineer

    July 1, 2008
    Good News-Bad News
    Today’s good news for California infrastructure contractors is that yesterday Governor Schwarzenegger signed into law AB1252. This bill exped......
    More
  • Carl Molesworth
    Pacific Builder and Engineer

    June 30, 2008
    Wyoming-Oregon Natural Gas Pipeline Planned
    A Texas-based pipeline company announced plans last week to build a pipeline capable of carrying more than 1 billion cubic feet per day of ......
    More
  • View All BlogsRSS

Photos

  • Targeted Development Spells Success
    In Franklin, Tenn., Southern Land Company is moving ahead with what it believes to be an ideal mix of development strategies, optimized equipment and fine-tuned market awareness.

  • Restoring A River
    Coalition of agencies and individuals creates new life for the San Juan River below Navajo Dam in northwestern New Mexico

  • Alternative Methods Controls Stormwater
    Excavation and installation of an advanced underground stormwater system by St. Paul Utilities (SPU) comprised a major portion of the recent construction at the Alternative Learning Center in the Midway area of St. Paul, Minnesota.

Advertisements





e-newsletters

Click to sign-up now for ACP’s free newsletters.

Construction eWire Canada
Construction eWire US
eRegional Reporter
Executive Insights
Design & Cost