Login  |  Register          Free Newsletter Subscription
Zibb
Subscribe to ACP Pubs
Email
Print
Reprint
Learn RSS

California’s Hi-Speed Rail On Track

Governor Schwarzenegger gives green light to place Prop 1a on November ballot.

By Loren Faulkner -- Associated Construction Publications, 8/27/2008

With California’s population expected to reach 50 million in two decades, the State is looking into alternative ways to transport people from San Francisco to San Diego, and within metro areas in between.

An electric bullet train system similar to those in Europe and Japan could travel at 220 mph, allowing passengers to reach Los Angeles from San Francisco in just 2.5 hours. Backers say the $40 billion project could move some 100 million passengers per year by 2030 through a 700 mile system, relieving gridlock and saving the costs of building more freeways and airport connections.

"If we don't do high-speed rail, we will have to add 3,000 miles of highway and five airport runways in the state," says Assemblymember Cathleen Galgiani, Stockton. But those construction costs could reach over $80 billion, according to hi-speed rail proponents.

The Hi-Speed Rail Authority’s website www.californiahighspeedtrains.com lists the completed High Speed Trains benefits:

  • Create 160,000 construction jobs and 450,000 permanent new jobs - American jobs that can't be outsourced.
  • Take 92 million vehicle trips off of the road every year.
  • Reduce greenhouse gas emissions by 12 billion pounds a year.
  • Reduce our dependence on foreign oil by up to 12.7 million barrels a year.
  • Increase commerce and tourism throughout the state.
  • Take travelers from the Bay Area to Southern California in 2+ hours, with stops in every major city on the way.
  • Set the standard for fast, safe, and efficient transportation in the 21st century.

On August 26, the Governor signed off on allowing Proposition 1a on the upcoming ballot so voters could allow a $9.95 billion bond for the first phase of the project. Matching Federal funds and private investment would eventually meet the entire cost of the hi-speed rail project.

Opponents of the proposed system are skeptical whether the estimated construction costs are realistic, or that it could be finished on schedule, or that actual travel would be as cost effective as proposed.

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

Sponsored Links

 
Advertisement
Click Go for full forecast

More Content

  • Blogs
  • Photos

Blogs


Sorry, no blogs are active for this topic.

View All Blogs RSS

Photos

Advertisements





e-newsletters

Click to sign-up now for ACP’s free newsletters.

Construction eWire Canada
Construction eWire US
Heavy Construction Weekly
Executive Insights
Design & Cost
About Us   |   Advertising Info   |   Site Map   |   Contact Us   |   Useful Sites   |   FREE Subscription   |   RSS
© 2009 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites