SR 5 (US 1) FROM PALMETTO PARK RD TO SR 850 (NORTHLAKE BLVD)
ID - T4723
ID - T4723
Location: FL PALM BEACH County District 4 District
Bid Date/Time: April 29, 2026, 10:30 a.m.
Project Type:
Status: Advertised
Description:
The Improvements under this Contract consist of but are not limited to, MOT (standard, ped escort/flagger, traffic control officer, ped LCD, arrow board, PCMS, ITS maintenance, barricade), protections (sediment barrier, inlet, tree), monitor structures (inspection, settlement, vibration), C&G (standard, selective), earthwork (excavation), concrete (removal, superstructure, curb/gutter, sidewalk, driveways), steel (reinforcing), architectural (bus shelter, bike rack, trash can), pavement markings (removable tape, detectable, RPM, thermoplastic, bike lane), signing (single-column), lighting (conductors, pole complete, pole relocate, cable distribution), signalization (signal cable, aluminum pole, ped signal, loop detector, loop assembly, ped detector, controller modify), conduit, pull/splice box, fiber optic (cable locate), drainage (pipe culvert, inlet, manhole), utility adjustment (manhole, valve box), landscaping (small, large), and sod along State Road 5 (US-1) at multiple locations from Palmetto Park Road to State Road 850 (Northlake Boulevard) for 15.399 (gross) miles in the Cities of Boca Raton, Delray Beach, and West Palm Beach, and the Town of Lantana, Palm Beach County.
The Improvements under this Contract consist of but are not limited to, MOT (standard, ped escort/flagger, traffic control officer, ped LCD, arrow board, PCMS, ITS maintenance, barricade), protections (sediment barrier, inlet, tree), monitor structures (inspection, settlement, vibration), C&G (standard, selective), earthwork (excavation), concrete (removal, superstructure, curb/gutter, sidewalk, driveways), steel (reinforcing), architectural (bus shelter, bike rack, trash can), pavement markings (removable tape, detectable, RPM, thermoplastic, bike lane), signing (single-column), lighting (conductors, pole complete, pole relocate, cable distribution), signalization (signal cable, aluminum pole, ped signal, loop detector, loop assembly, ped detector, controller modify), conduit, pull/splice box, fiber optic (cable locate), drainage (pipe culvert, inlet, manhole), utility adjustment (manhole, valve box), landscaping (small, large), and sod along State Road 5 (US-1) at multiple locations from Palmetto Park Road to State Road 850 (Northlake Boulevard) for 15.399 (gross) miles in the Cities of Boca Raton, Delray Beach, and West Palm Beach, and the Town of Lantana, Palm Beach County.
Project Roles
Owners
- Owner FLORIDA DEPARTMENT OF TRANSPORTATION, 605 SUWANNEE STREET TALLAHASSEE FL 32301
| Your local Iowa Mold Tooling Co Inc dealer |
|---|
| Nichols Fleet Equipment |