TRAFFIC OPS SIGNAL PUSHBUTTON CONTRACT WITH MOBILIZATION
ID - E51G5
ID - E51G5
Location: FL DIST/ST-WIDE County District 5 District
Bid Date/Time: April 7, 2026, 2 p.m.
Project Type:
Status: Advertised
Description:
The Improvements under this Contract consist of installing new, repairing and/or modifying traffic signalization infrastructure, signing and pavement markings, pedestrian signal installations, such as, crosswalks, accessible pedestrian signals, and mid-block crosswalks. The intent of this contract is to provide means for the DEPARTMENT to quickly respond to unexpected safety and/or operational issues for a period of two (2) years or until the contracted amount has been reached. The number of work documents for the contract will be limited by a budgetary cap of $1,284,890. This contract is for work within FDOT District Five boundary. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the work plan, specifications, procedures, and terms of the contract. The DEPARTMENT will not specify contractor crew size, work methods or equipment complements, provided the desired work quality is achieved as evaluated by the Project Engineer. The work under this Contract will be controlled by the issuance of Work Documents. All work in this contract is considered specialty work. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Departments estimated quantities and the Contractors bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. PREQUALIFICATION REQUIRED
The Improvements under this Contract consist of installing new, repairing and/or modifying traffic signalization infrastructure, signing and pavement markings, pedestrian signal installations, such as, crosswalks, accessible pedestrian signals, and mid-block crosswalks. The intent of this contract is to provide means for the DEPARTMENT to quickly respond to unexpected safety and/or operational issues for a period of two (2) years or until the contracted amount has been reached. The number of work documents for the contract will be limited by a budgetary cap of $1,284,890. This contract is for work within FDOT District Five boundary. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the work plan, specifications, procedures, and terms of the contract. The DEPARTMENT will not specify contractor crew size, work methods or equipment complements, provided the desired work quality is achieved as evaluated by the Project Engineer. The work under this Contract will be controlled by the issuance of Work Documents. All work in this contract is considered specialty work. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Departments estimated quantities and the Contractors bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. PREQUALIFICATION REQUIRED
Project Roles
Owners
- Owner FLORIDA DEPARTMENT OF TRANSPORTATION, 605 SUWANNEE STREET TALLAHASSEE FL 32301
| Your local Wirtgen America dealer |
|---|
| Dobbs Equipment (DXC) |
| Dobbs Equipment (DXC) |