Concrete reconstruction and bridge rehabilitation.
ID - 47065-130001
ID - 47065-130001
Location: MI Livingston County County 06006 District
Bid Date/Time: Sept. 2, 2022, 10:30 a.m.
Project Type:
Bridge
Status: Advertised
Description:
Concrete reconstruction and bridge rehabilitation. 3.60 mi of concrete reconstruction, concrete curb and gutter, sewer work, guardrail and pavement markings and bridge rehabilitation including epoxy overlay, deck patching, deck replacement, steel repair, substructure repair, substructure patching, joint replacement, concrete and steel beam end repair, structural steel repairs, slope paving repair, structural steel painting and approach work on I-96 from Chilson Road to Dorr Road, Livingston County. This project includes a 5 year materials and workmanship pavement warranty (HMA or Concrete), a 2 year warranty on concrete surface coating, two 5 year warranties on thin epoxy polymer bridge deck overlay and a 2 year warranty on bridge coating. This project is an Alternate Pavement Bid project. Alternate 1 (Section 2) is an HMA Alternative and includes a 5 year materials and workmanship pavement warranty. Alternate 2 (Section 3) is a Concrete Alternative and includes a 5 year materials and workmanship pavement warranty. ** 51687 B or 51687 Cb or 51687 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of B, Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Concrete reconstruction and bridge rehabilitation. 3.60 mi of concrete reconstruction, concrete curb and gutter, sewer work, guardrail and pavement markings and bridge rehabilitation including epoxy overlay, deck patching, deck replacement, steel repair, substructure repair, substructure patching, joint replacement, concrete and steel beam end repair, structural steel repairs, slope paving repair, structural steel painting and approach work on I-96 from Chilson Road to Dorr Road, Livingston County. This project includes a 5 year materials and workmanship pavement warranty (HMA or Concrete), a 2 year warranty on concrete surface coating, two 5 year warranties on thin epoxy polymer bridge deck overlay and a 2 year warranty on bridge coating. This project is an Alternate Pavement Bid project. Alternate 1 (Section 2) is an HMA Alternative and includes a 5 year materials and workmanship pavement warranty. Alternate 2 (Section 3) is a Concrete Alternative and includes a 5 year materials and workmanship pavement warranty. ** 51687 B or 51687 Cb or 51687 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of B, Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Project Roles
Owners
- Owner MICHIGAN DEPARTMENT OF TRANSPORTATION, 400 TRANSPORTATION LN LANSING MI 48822
| Your local Wirtgen America dealer |
|---|
| United Construction & Forestry |
| WI Clark |
| Dobbs Equipment (SC) |