New England Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com
Location: MI Branch County County 05004 District
Bid Date/Time: Nov. 4, 2022, 10:30 a.m.
Project Type: Bridge
Status: Awarded
Description:
Hot mix asphalt cold milling and resurfacing, concrete sidewalk and bridge rehabilitation includes epoxy overlay. 0.75 mi of hot mix asphalt cold milling and resurfacing, detail 7 and 8 joint repairs, guardrail, concrete sidewalk, signing, pavement markings and bridge rehabilitation including epoxy overlay, railing and deck fascia replacement, abutment repair, joint replacement, concrete surface coating and approach work on US-12 from east of the Coldwater River to west of Western Avenue and US-12 over the Coldwater River in the city of Coldwater, Branch County. This project includes two 5 year materials and workmanship pavement warranties and a 2 year concrete surface coating warranty. ** 1802 Cb **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-6M. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
Owners
  • Owner MICHIGAN DEPARTMENT OF TRANSPORTATION, 400 TRANSPORTATION LN LANSING MI 48822
Bidders
  • Bidder RIETH-RILEY CONSTRUCTION CO., INC., - $2,377,551, PO Box 477 Goshen IN 46527
  • Bidder MICHIGAN PAVING AND MATERIALS COMPANY, - $2,436,680, 2575 S Haggerty Rd Ste 100 Canton MI 48188
Apparent Low Bidder: RIETH-RILEY CONSTRUCTION CO., INC.
Volvo CE
Your local Volvo Construction Equipment dealer
Tyler Equipment