Hot mix asphalt resurfacing, sidewalk ramp upgrades, add bike lanes, water main and pavement markings.
ID - 81000-210417
ID - 81000-210417
Location: MI Washtenaw County County 06006 District
Bid Date/Time: May 5, 2023, 10:30 a.m.
Project Type:
Resurfacing
Status: Awarded
Description:
Hot mix asphalt resurfacing, sidewalk ramp upgrades, add bike lanes, water main and pavement markings. 1.67 mi of hot mix asphalt resurfacing, sidewalk ramp upgrades, add bike lanes, water main, crosswalk markings, in-street pedestrian signing, lighting, signing and pavement markings on South State Street from South University to Granger Road, Hill Street from Fifth Avenue to Forest Avenue and South Fifth Avenue to Washtenaw Avenue in the city of Ann Arbor, Washtenaw County. This is a Local Agency project. ** Comb/Jt. 7009 Cb, Ea or Comb/Jt. 7009 Cb, K or Comb/Jt. 7009 Ea, K ** In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Hot mix asphalt resurfacing, sidewalk ramp upgrades, add bike lanes, water main and pavement markings. 1.67 mi of hot mix asphalt resurfacing, sidewalk ramp upgrades, add bike lanes, water main, crosswalk markings, in-street pedestrian signing, lighting, signing and pavement markings on South State Street from South University to Granger Road, Hill Street from Fifth Avenue to Forest Avenue and South Fifth Avenue to Washtenaw Avenue in the city of Ann Arbor, Washtenaw County. This is a Local Agency project. ** Comb/Jt. 7009 Cb, Ea or Comb/Jt. 7009 Cb, K or Comb/Jt. 7009 Ea, K ** In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Project Roles
Owners
- Owner MICHIGAN DEPARTMENT OF TRANSPORTATION, 400 TRANSPORTATION LN LANSING MI 48822
Bidders
- Bidder F. H. PASCHEN, S.N. NIELSEN & ASSOCIATES LLC, - $7,513,221, 5515 N. East River Road Chicago IL 60656
- Bidder FONSON COMPANY, INC., - $7,454,723, 7644 Whitmore Lake Rd Brighton MI 48116
Apparent Low Bidder: FONSON COMPANY, INC.
| Your local Trimble Construction Division dealer |
|---|
| SITECH Northeast |