TUNNEL PLENUM LINER SEAL
ID - C24591
ID - C24591
Location: CO CLEAR CREEK|SUMMIT County 1312 District
Bid Date/Time: July 14, 2022, 10 a.m.
Project Type:
Pavement Preservation
Status: Initial
Description:
TUNNEL PLENUM LINER SEAL EISENHOWER JOHNSON MEMORIAL TUNNEL Groundwater infiltration into the tunnel excavation permeating through the liner has occurred for decades, resulting in excessive labor efforts in repairs and managing water. The Grouting and Structural Repair project aims to fix this by drilling through the tunnel liner and the initial support members, into the rock mass, and applying consolidation grouting.
TUNNEL PLENUM LINER SEAL EISENHOWER JOHNSON MEMORIAL TUNNEL Groundwater infiltration into the tunnel excavation permeating through the liner has occurred for decades, resulting in excessive labor efforts in repairs and managing water. The Grouting and Structural Repair project aims to fix this by drilling through the tunnel liner and the initial support members, into the rock mass, and applying consolidation grouting.
Project Roles
Owners
- Owner COLORADO DEPARTMENT OF TRANSPORTATION, 400 SOUTH COLORADO BLVD DENVER CO 80204
| Your local Wirtgen America dealer |
|---|
| United Construction & Forestry |
| WI Clark |
| Dobbs Equipment (SC) |