The resurfacing on U.S. 70S (S.R. 1) from east of Griffith Lane (L.M. 14.77) to west of Mud Creek Road (L.M. 18.50) and on S.R. 288 from U.S. 70S (S.R. 1) (L.M. 0.00) to near Collins River Drive (L.M. 4.77).
ID - CNX123
ID - CNX123
Location: TN WARREN County
Bid Date/Time: March 31, 2023, 10 a.m.
Project Type:
Resurfacing
Status: Awarded
Description:
The resurfacing on U.S. 70S (S.R. 1) from east of Griffith Lane (L.M. 14.77) to west of Mud Creek Road (L.M. 18.50) and on S.R. 288 from U.S. 70S (S.R. 1) (L.M. 0.00) to near Collins River Drive (L.M. 4.77). The resurfacing on U.S. 70S (S.R. 1) from east of Griffith Lane (L.M. 14.77) to west of Mud Creek Road (L.M. 18.50) and on S.R. 288 from U.S. 70S (S.R. 1) (L.M. 0.00) to near Collins River Drive (L.M. 4.77).
The resurfacing on U.S. 70S (S.R. 1) from east of Griffith Lane (L.M. 14.77) to west of Mud Creek Road (L.M. 18.50) and on S.R. 288 from U.S. 70S (S.R. 1) (L.M. 0.00) to near Collins River Drive (L.M. 4.77). The resurfacing on U.S. 70S (S.R. 1) from east of Griffith Lane (L.M. 14.77) to west of Mud Creek Road (L.M. 18.50) and on S.R. 288 from U.S. 70S (S.R. 1) (L.M. 0.00) to near Collins River Drive (L.M. 4.77).
Project Roles
Owners
- Owner TENNESSEE DEPARTMENT OF TRANSPORTATION, 3288 SUMMER AVENUE NASHVILLE TN 37246
Bidders
- Bidder TINSLEY ASPHALT, LLC, - $5,512,609, 303 Ake Street Estill Springs TN 37330
Apparent Low Bidder: TINSLEY ASPHALT, LLC
| Your local Wirtgen America dealer |
|---|
| United Construction & Forestry |
| WI Clark |
| Dobbs Equipment (SC) |