System Preservation (Engineering)
BRIDGE REHABILITATION
Drainage and Sediment Control
ID - 2017073
ID - 2017073
Location: AZ Coconino|Coconino County
Bid Date/Time: Jan. 21, 2022, 11 a.m.
Project Type:
Bridge
Status:
Description:
System Preservation (Engineering) BRIDGE REHABILITATION Drainage and Sediment Control The proposed project 089A CN 387 H8778 01C is located in Coconino County within the Coconino National Forest on State Route 89A, MP 387.28 to MP 387.43. The work consists of Pumphouse Wash Bridge Rehabilitation. The work includes bridge deck and railing replacement, new approach slabs, painting of the bridge, pier encasement and scour mitigation; milling and repaving; guardrail replacement; restoration of a culvert outlet; signing and striping; seeding and other related work. The proposed project 089A CN 388 H8907 01C is located in Coconino County within the Coconino National Forest on State Route 89A from MP 387.92 to MP 388.73 for location A and B and from MP 388.90 to MP 388.96 for Location C. The work consists of drainage and sediment control improvement by reducing erosion to preserve deteriorating slopes and reduce downstream pollution. The work includes installing concrete barrier, pipes, retaining wall and catch basin; gabion mattresses; roadside drainage excavation; seeding and other related work. The proposed project 089A CN 375 F0154 01C is located in Coconino County on State Route 89A at MP 375.1 and MP 389.2. The work consists of improvements to mitigate rockfall at those locations, pavement improvements, pavement marking, traffic control and other related work.
System Preservation (Engineering) BRIDGE REHABILITATION Drainage and Sediment Control The proposed project 089A CN 387 H8778 01C is located in Coconino County within the Coconino National Forest on State Route 89A, MP 387.28 to MP 387.43. The work consists of Pumphouse Wash Bridge Rehabilitation. The work includes bridge deck and railing replacement, new approach slabs, painting of the bridge, pier encasement and scour mitigation; milling and repaving; guardrail replacement; restoration of a culvert outlet; signing and striping; seeding and other related work. The proposed project 089A CN 388 H8907 01C is located in Coconino County within the Coconino National Forest on State Route 89A from MP 387.92 to MP 388.73 for location A and B and from MP 388.90 to MP 388.96 for Location C. The work consists of drainage and sediment control improvement by reducing erosion to preserve deteriorating slopes and reduce downstream pollution. The work includes installing concrete barrier, pipes, retaining wall and catch basin; gabion mattresses; roadside drainage excavation; seeding and other related work. The proposed project 089A CN 375 F0154 01C is located in Coconino County on State Route 89A at MP 375.1 and MP 389.2. The work consists of improvements to mitigate rockfall at those locations, pavement improvements, pavement marking, traffic control and other related work.
Project Roles
Owners
- Owner ARIZONA DEPARTMENT OF TRANSPORTATION, 1600 WEST WASHINGTON STREET SUITE 400 PHOENIX AZ 85007
| Your local Volvo Construction Equipment dealer |
|---|
| Tyler Equipment |