Region 5 Year 5 Bridge Preventative Maintenance
ID - C20706
ID - C20706
Location: CO SAN MIGUEL|MONTROSE, REGION 3 County 5111 District
Bid Date/Time: Feb. 3, 2022, 10 a.m.
Project Type:
Bridge
Status:
Description:
Region 5 Year 5 Bridge Preventative Maintenance This bridge rehabilitation project is part of the RAMP Bridge Preventative Maintenance Program. The project is located within San Miguel and Montrose counties, and is located along State Highway numbers 141 and 145. The approximate beginning-ending project limits are MP 58.0 to 89.5 on SH 141 for Str. L-02-B, L-02-F, K-02-C, K-01-F, K-01-B, and K-01-A on SH 141. And for the two bridges on SH 145, range from MP 93 to 97 for Str. L-04-U, and L-04-A. The work includes: removing and replacing existing asphalt on bridges, removing portions of present structure (class 2 and 3), concrete patching decks, sawcutting and sealing of transverse joints bridges, Removing and replacing bridge rail, sealing bridge decks, installing waterproofing membrane on bridges. Removing timber headers on bridges, Removing and replacing bridge expansion devices on bridges, paint structure, placing flow-fill and repairing wingwall, re-striping of paint on bridges, guardrail work. Traffic control within the project limits will be limited to single lane closures on the work areas.
Region 5 Year 5 Bridge Preventative Maintenance This bridge rehabilitation project is part of the RAMP Bridge Preventative Maintenance Program. The project is located within San Miguel and Montrose counties, and is located along State Highway numbers 141 and 145. The approximate beginning-ending project limits are MP 58.0 to 89.5 on SH 141 for Str. L-02-B, L-02-F, K-02-C, K-01-F, K-01-B, and K-01-A on SH 141. And for the two bridges on SH 145, range from MP 93 to 97 for Str. L-04-U, and L-04-A. The work includes: removing and replacing existing asphalt on bridges, removing portions of present structure (class 2 and 3), concrete patching decks, sawcutting and sealing of transverse joints bridges, Removing and replacing bridge rail, sealing bridge decks, installing waterproofing membrane on bridges. Removing timber headers on bridges, Removing and replacing bridge expansion devices on bridges, paint structure, placing flow-fill and repairing wingwall, re-striping of paint on bridges, guardrail work. Traffic control within the project limits will be limited to single lane closures on the work areas.
Project Roles
Owners
- Owner COLORADO DEPARTMENT OF TRANSPORTATION, 400 SOUTH COLORADO BLVD DENVER CO 80204
| Your local Wirtgen America dealer |
|---|
| United Construction & Forestry |
| WI Clark |
| Dobbs Equipment (SC) |