The resurfacing on S.R. 104 from Garner Street (L.M. 17.56) to near S.R. 100 (L.M. 29.44), including bridge deck repair and thin epoxy overlay.
ID - CNW121
ID - CNW121
Location: TN HENDERSON County
Bid Date/Time: March 25, 2022, 10 a.m.
Project Type:
Bridge
Status: Awarded
Description:
The resurfacing on S.R. 104 from Garner Street (L.M. 17.56) to near S.R. 100 (L.M. 29.44), including bridge deck repair and thin epoxy overlay. The resurfacing on S.R. 104 from Garner Street (L.M. 17.56) to near S.R. 100 (L.M. 29.44), including bridge deck repair and thin epoxy overlay.
The resurfacing on S.R. 104 from Garner Street (L.M. 17.56) to near S.R. 100 (L.M. 29.44), including bridge deck repair and thin epoxy overlay. The resurfacing on S.R. 104 from Garner Street (L.M. 17.56) to near S.R. 100 (L.M. 29.44), including bridge deck repair and thin epoxy overlay.
Project Roles
Owners
- Owner TENNESSEE DEPARTMENT OF TRANSPORTATION, 3288 SUMMER AVENUE NASHVILLE TN 37246
Bidders
- Bidder PAVEMENT RESTORATIONS, INC., - $1,736,687, 10162 Stinson Street Milan TN 38358
Apparent Low Bidder: PAVEMENT RESTORATIONS, INC.
| Your local Volvo Construction Equipment dealer |
|---|
| Tyler Equipment |