US 24 - WOODLAND PARK TO CHIPITA PARK RESURFACING & SAFETY
ID - C23188B-COMBO
ID - C23188B-COMBO
Location: CO EL PASO|TELLER County 2120 District
Bid Date/Time: Nov. 3, 2022, 10 a.m.
Project Type:
Resurfacing
Status: Awarded
Description:
US 24 - WOODLAND PARK TO CHIPITA PARK RESURFACING & SAFETY 10.35 miles of resurfacing on US 24, beginning at M.P. 281.03 and ending in Chipita Park at M.P. 291.38. Work includes 2.89 miles of 2" overlay, 7.46 miles of 2" mill and overlay, 100 SY of full depth pavement reconstruction, 3,900 SY of 5" mill and overlay, construction of 4 embankment protectors, replacement of 1 traffic counter sensor array, replacement of 44 ADA curb ramps in Woodland Park, and updating guardrail, signs, and stripes along the project corridor.
US 24 - WOODLAND PARK TO CHIPITA PARK RESURFACING & SAFETY 10.35 miles of resurfacing on US 24, beginning at M.P. 281.03 and ending in Chipita Park at M.P. 291.38. Work includes 2.89 miles of 2" overlay, 7.46 miles of 2" mill and overlay, 100 SY of full depth pavement reconstruction, 3,900 SY of 5" mill and overlay, construction of 4 embankment protectors, replacement of 1 traffic counter sensor array, replacement of 44 ADA curb ramps in Woodland Park, and updating guardrail, signs, and stripes along the project corridor.
Project Roles
Owners
- Owner COLORADO DEPARTMENT OF TRANSPORTATION, 400 SOUTH COLORADO BLVD DENVER CO 80204
Bidders
- Bidder EDW C LEVY CO DBA SCHMIDT, - $23,315,437, 2635 DELTA DRIVE COLORADO SPRINGS CO 80910
- Bidder KIEWIT INFRASTRUCTURE CO., - $15,167,304, 10055 Trainstation Circle 2nd Floor CO 80124 (303)979-9330 NJ 7677
- Bidder MARTIN MARIETTA MATERIALS, INC., - $18,630,089, 1627 Cole Blvd Suite 200 CO 80401 (720)245-6478 TX
Apparent Low Bidder: KIEWIT INFRASTRUCTURE CO.
| Your local Wirtgen America dealer |
|---|
| United Construction & Forestry |
| WI Clark |
| Dobbs Equipment (SC) |