New England Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com
Location: AZ Gila County
Bid Date/Time: Oct. 20, 2023, 11 a.m.
Project Type: Bridge
Status:
Description:
System Preservation (Bridge Replacement) The proposed work is located at the Pinal Creek Bridge, Cottonwood Street, adjacent to US Route 60 within Globe, in Gila County, Arizona. The project begins 1200 feet northwest of milepost 251, at the bridge crossing of West Cottonwood Street over Pinal Creek. The work consists of replacing the existing five-span, reinforced concrete slab bridge with a four-span cast-in-place reinforced concrete closed frame structure. The work also includes the reconstruction of the immediate Cottonwood approaches to match the new bridge section. The work also includes site restoration, and other related work.
Owners
  • Owner ARIZONA DEPARTMENT OF TRANSPORTATION, 1600 WEST WASHINGTON STREET SUITE 400 PHOENIX AZ 85007
Volvo CE
Your local Volvo Construction Equipment dealer
Tyler Equipment