System Preservation (Bridge Replacement)
ID - 2023047
ID - 2023047
Location: AZ Gila County
Bid Date/Time: Oct. 20, 2023, 11 a.m.
Project Type:
Bridge
Status:
Description:
System Preservation (Bridge Replacement) The proposed work is located at the Pinal Creek Bridge, Cottonwood Street, adjacent to US Route 60 within Globe, in Gila County, Arizona. The project begins 1200 feet northwest of milepost 251, at the bridge crossing of West Cottonwood Street over Pinal Creek. The work consists of replacing the existing five-span, reinforced concrete slab bridge with a four-span cast-in-place reinforced concrete closed frame structure. The work also includes the reconstruction of the immediate Cottonwood approaches to match the new bridge section. The work also includes site restoration, and other related work.
System Preservation (Bridge Replacement) The proposed work is located at the Pinal Creek Bridge, Cottonwood Street, adjacent to US Route 60 within Globe, in Gila County, Arizona. The project begins 1200 feet northwest of milepost 251, at the bridge crossing of West Cottonwood Street over Pinal Creek. The work consists of replacing the existing five-span, reinforced concrete slab bridge with a four-span cast-in-place reinforced concrete closed frame structure. The work also includes the reconstruction of the immediate Cottonwood approaches to match the new bridge section. The work also includes site restoration, and other related work.
Project Roles
Owners
- Owner ARIZONA DEPARTMENT OF TRANSPORTATION, 1600 WEST WASHINGTON STREET SUITE 400 PHOENIX AZ 85007
| Your local Volvo Construction Equipment dealer |
|---|
| Tyler Equipment |