Dixie Contractor

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Dallas North Tollway Fourth Lane Project in Frisco Now Underway

PLANO, TX — Drivers who use the Dallas North Tollway (DNT) in Frisco will soon see work underway to make their commutes easier and provide better access to developments near the DNT.

The North Texas Tollway Authority (NTTA) will begin adding a fourth lane in each direction of the DNT between the Sam Rayburn Tollway (SRT) and US 380 in Frisco. The project will also include ramp and intersection improvements.

“These DNT improvements show NTTA’s commitment to meeting the mobility demands of a rapidly-expanding North Texas,” said NTTA Assistant Executive Director of Infrastructure Elizabeth Mow.

Speed limits between El Dorado Parkway and PGA Parkway will be reduced from 70 to 60 mph during construction. Drivers are asked to stay alert to changing conditions, reduced speed limits, and to watch for construction vehicles entering and exiting the work zone during construction on the DNT in Frisco.

Construction is anticipated to be completed in late 2025, weather permitting.

The DNT Fourth Lane Project is NTTA’s latest expansion project. Recently, a fourth lane in both directions was added to the SRT. Also, additional lanes of the President George Bush Turnpike between State Highway 78 in Garland and Interstate 20 in Grand Prairie have been completed and are now open to traffic.
Gomaco
Your local Gomaco dealer
Ring Power Corporation
Vogele
Your local Wirtgen America dealer
Power Equipment Co
SITECH
Your local Trimble Construction Division dealer
SITECH Mid-South
SITECH South
SITECH Tri-Rivers