We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy. In addition, the California Consumer Privacy Act ("CCPA") provides certain rights with respect to your personal information. Please click here for more information.

Home » Michael Baker International Joins Project Team for Washington State DOT's I-405 Widening and Express Toll Lane

Michael Baker International Joins Project Team for Washington State DOT's I-405 Widening and Express Toll Lane

June 15, 2020
No Comments
SEATTLE, WA — Michael Baker International joins the team that will complete the widening and express toll lane project between Renton and Bellevue, Washington, for the Washington State Department of Transportation (WSDOT). The project will utilize innovative design-build project delivery and includes constructing one new lane in each direction of I-405. This new lane, along with the existing high-occupancy vehicle lane, will be operated as a dual-lane express toll lane system. Michael Baker's role in the project includes providing maintenance of traffic for the entire 11-mile project, roadway design for a three-mile segment, drainage design for a three-mile segment, and one bridge widening. The firm will serve as a subconsultant to Wood in the Flatiron West, Inc./The Lane Construction Corporation Joint Venture.

"Our team regularly combines passion with technical and design-build know-how to create transportation systems that provide access and connection for people and goods, ultimately spurring economic growth and improving quality of life for commuters," said Malcolm Dougherty, National Practice Executive - Transportation at Michael Baker International. "For the I-405 project, our expert knowledge of maintenance of traffic will ensure the safety of drivers and workers alike, while keeping traffic moving as work progresses. The final product will give drivers a choice to use the express toll lanes when they need it, allowing travelers to have a safer, more reliable trip and helping WSDOT achieve their long-standing vision for I-405."

The $705-million design-build project will help reduce congestion and improve safety along one of Washington's most congested sections of highway. The project will increase roadway capacity, enhance mobility, provide environmental enhancements, and improve traffic operations and public safety. Construction is expected to commence this year and the project will be completed and open to traffic in 2024.
Pacific Builder & Engineer Projects
  • Related Articles

    Washington DOT Awards Contract for I-405 Widening and Express Toll Lanes Project

    Washington State DOT Brings Critical Improvements to I-90 Snoqualmie Pass

    Making Connections: WSDOT Awards Contract for Improvements at I-405/SR 167 Interchange

Post a comment to this article

Report Abusive Comment

Select a Region

See stories from other regions.

Select region map Select region map
ACP logo associated construction publications logo
  • About
  • Editorial Calendar
  • Archived Issues
  • Contact Us
  • Subscribe
  • Privacy Policy

Copyright ©2021. All Rights Reserved
Design, CMS, Hosting & Web Development :: ePublishing

Copyright ©2021. All Rights Reserved
Design, CMS, Hosting & Web Development :: ePublishing