Dixie Contractor

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Stafford MSD Celebrates Ribbon Cutting of New Facilities

Stafford Middle School
Stafford Middle School
Stafford MSD Administration Building
Stafford MSD Administration Building
HOUSTON, TX — Stafford Municipal School District (SMSD), the only municipal school district in Texas, recently celebrated the ribbon cutting of its new middle school, administration building, and early childhood center. The ribbon cutting was held in Stafford, Texas. Attendees also got a tour around campus.

“Our original ribbon cutting plan was to host a huge celebration for the Stafford community, however, in light of the pandemic, we had to adjust and limit attendance,” said Cherise Roberts, Coordinator of Grants and Partnerships at SMSD. “We are grateful to capture the ribbon cutting on video, and we look forward to future gatherings on our new Education Plaza and to rename the Leonard Scarcella Administration Building for others to join.”

“The groundbreaking marks an important achievement toward managing SMSD’s growth and providing its students the educational needs of the 21st century,” said JP Grom, Vice President at Lockwood Andrews & Newnam, Inc. (LAN), the firm serving as the program manager for the bond program.

The new facilities are part of SMSD’s $62-million bond program that passed in November 2017. The bond program provided funds to address growth and expansion at SMSD, which enrolled approximately 3,600 students in the 2019-20 school year.

The new $26-million middle school will accommodate 950 students in sixth, seventh, and eighth grade. The three-story building, encompassing 139,360 square feet, includes 21st century classrooms, science laboratories, robotics, engineering and computer labs, band and two art rooms, fitness room, library, two gymnasiums, and a cafetorium. The existing middle school was built in 1983 during the district’s inception.

The new two-story, 26,362-square-foot administrative building includes office areas, training and conferences rooms, and a board room for meetings. The $6.9-million facility includes a district memorabilia area where there will also be a 3D model of the complex installed. Both buildings were designed by AutoArch Architects and are being constructed by Drymalla Construction.

The newly converted early childhood center encompasses classroom space for grades Pre-K and Kindergarten, a daycare center for a capacity of 22, and new outdoor age appropriate play equipment enclosed by privacy fencing.

Other elements of the bond program include conversion of the existing middle school into a new Science, Technology, Engineering, and Math (STEM) magnet school for grades 3-8 that will open in 2021-22 — the only one of its kind in Fort Bend County, a repurposed community center in place of the former administration building, a new outdoor educational plaza, and renovation of the existing elementary and high schools.
SITECH
Your local Trimble Construction Division dealer
SITECH Mid-South
SITECH South
SITECH Tri-Rivers
Doosan Infracore Portable Pwr
Your local Bobcat dealer
Pinnacle Central Co Inc
Vogele
Your local Wirtgen America dealer
Power Equipment Co