Current Bids
09-09-25
AK Valdez-Cordova County NR District - Trooper Bruce A. Heck Memorial Corridor Sign Replacement (NSHWY01090)
- Bid Date:
- September 9, 2025
- Project Type(s)
09-10-25
WA Douglas County - SR28 EWC 2025 DEMO NO. 1 25B008 (25B008)
- Bid Date:
- September 10, 2025
- Project Type(s)
- Description
- SR28 EWC 2025 DEMO NO. 1 25B008 SR28 EWC 2025 DEMO NO. 1 25B008
- Plans:
09-11-25
OR MULTNOMAH County 1 District - CORNELIUS PASS HWY & US30 ITS IMPROVEMENTS (15611)
- Bid Date:
- September 11, 2025
- Project Type(s)
OR YAMHILL County 2 District - OR18B CURB RAMPS (WILLAMINA/SHERIDAN) (15614)
- Bid Date:
- September 11, 2025
- Project Type(s)
OR YAMHILL County 2 District - OR99W/OR153 CURB RAMPS (AMITY) (15610)
- Bid Date:
- September 11, 2025
- Project Type(s)
- Description
- OR99W/OR153 CURB RAMPS (AMITY) OR99W/OR153 CURB RAMPS (AMITY)
- Plans:
Your local Gomaco dealer |
---|
American Construction Supply |
Tri-State Truck & Equipment Inc |
09-16-25
AK CR District - Chuathbaluk Airport Rehabilitation Survey and Mapping Services (25262004)
- Bid Date:
- September 16, 2025
- Project Type(s)
- Description
- Chuathbaluk Airport Rehabilitation Survey and Mapping Services The Contractor shall provide survey & mapping services to complete the design phase of this project. Services include Control, Design, ROW Surveying and Mapping as required by the Contracting Agency. Pre-and Post-construction work may be added by amendment if deemed necessary by the Contracting Agency.
- Plans:
ID Idaho County 28111 District - US-95, Hat Creek Bridge (20450250318)
- Bid Date:
- September 16, 2025
- Project Type(s)
09-17-25
AK Kenai Peninsula County CR District - Anchor Point Road MP 0-1.3 Pavement Preservation (CFHWY00601)
- Bid Date:
- September 17, 2025
- Project Type(s)
09-18-25
MT Gallatin County 2 District - TARGHEE PASS - EAST (01925)
- Bid Date:
- September 18, 2025
- Project Type(s)
- Description
- TARGHEE PASS - EAST The proposed project was nominated as a pavement preservation project to seal & cover the full width of 8.6 miles of US-20 (N-12) west of West Yellowstone. In addition to seal and cover, RP 0.0 to 1.2 will also be milled and overlayed. A failing double culvert for Buttermilk Creek at approximate reference post 3.5 will be replaced. A full ? width digout will be conducted at reference post 4.53 to approximate reference post 4.62.
- Plans:
MT Hill County 3 District - 14TH AVENUE - HAVRE (03525R)
- Bid Date:
- September 18, 2025
- Project Type(s)
- Description
- 14TH AVENUE - HAVRE This project proposes to cold mill, crack seal, and seal & cover 14th Ave. in Havre, MT. The project begins at the intersection of 14th Ave. and 7th St. and extends north approximately 0.4 miles, terminating at the concrete/asphalt connection near the intersection of 14th Ave. and 2nd St.
- Plans:
Your local Bobcat dealer |
---|