Current Bids
10-28-25
AK Northwest Arctic County NR District - Buckland Airport Improvements Construction Administration (25261006)
- Bid Date:
- October 28, 2025
- Project Type(s)
- Description
- Buckland Airport Improvements Construction Administration Professional engineering services for construction administration support as required to ensure proper inspection, contract compliance, and documentation of the Buckland Airport Improvement Project. The level of construction administration documentation is project-dependent and will follow the requirements of the Alaska Construction Manual, including but not limited to: day-to-day inspection, project record-keeping, quality assurance, and performing onsite project engineering duties.
- Plans:
AK SR District - Avalanche Forecasting and Hazard Reduction Services for Skagway, AK (25263008)
- Bid Date:
- October 28, 2025
- Project Type(s)
- Description
- Avalanche Forecasting and Hazard Reduction Services for Skagway, AK The Department of Transportation & Public Facilities (DOT&PF), Maintenance and Operations (M&O) is seeking a Consultant to provide Avalanche Forecasting and Hazard Reduction for the Klondike Highway between Mile posts 6 - 14 in Skagway, Alaska from December 1 through May 15 each year.
- Plans:
AK Statewide County SR District - SIT HALIBUT POINT RD & PETERSON AVE INTERSECTION SAFETY IMPR (SFHWY00103)
- Bid Date:
- October 28, 2025
- Project Type(s)
- Description
- SIT HALIBUT POINT RD & PETERSON AVE INTERSECTION SAFETY IMPR Provide additional illumination at the Halibut Point Road/Peterson Avenue Intersection to achieve a level of luminance that meets current DOT&PF standards. Modify adjacent roadway lighting as needed to maintain satisfactory continuous illumination. Establish a pass-through crossing to facilitate less challenging pedestrian movements. Improve intersection sight distance by removing utility equipment located in the southeast quadrant of the intersection, acquiring property to remove parking spaces that, when occupied, create sight line obstructions, and modifying access to an apartment building adjacent to the intersection (shorten curb cut). Replace existing S1-1 School signs …
- Plans:
ID Oneida County 78112 District - BANNOCK STREET, MALAD CITY (19622250116)
- Bid Date:
- October 28, 2025
- Project Type(s)
- Description
- BANNOCK STREET, MALAD CITY For the work of roadway reconstruction from 100 W to 300 W with replacement of curb, gutter, sidewalk, driveways, ADA ramps, landscape strip, storm sewer, sanitary sewer systems & the addition of new curb, gutter, sidewalk & storm sewer system from 300 W to RR tracks
- Plans:
10-29-25
AK Anchorage County CR District - HSIP: Mountain View Drive Safety Improvements Design Services (25262007)
- Bid Date:
- October 29, 2025
- Project Type(s)
- Description
- HSIP: Mountain View Drive Safety Improvements Design Services The Contractor shall provide professional design services for the HSIP: Mountain View Drive Safety Improvement project. This includes 1.8 miles of Commercial Drive and Mountain View Drive. The project begins at MP 0.0 of Commercial Drive and ends at MP 1.48 of Mountain View Drive.
- Plans:
| Your local Volvo Construction Equipment dealer |
|---|
| PacWest Machinery |
WA WHITMAN County - SR 194 BUSCH BRIDGE AT PORT OF ALMOTA BRIDGE REHAB 25Z004 (25Z004)
- Bid Date:
- October 29, 2025
- Project Type(s)
- Description
- SR 194 BUSCH BRIDGE AT PORT OF ALMOTA BRIDGE REHAB 25Z004
- Plans:
10-30-25
OR LANE County 2 District - I-5: COTTAGE GROVE - MARTIN CREEK (15621)
- Bid Date:
- October 30, 2025
- Project Type(s)
- Description
- I-5: COTTAGE GROVE - MARTIN CREEK I-5: COTTAGE GROVE - MARTIN CREEK
- Plans:
OR MULTNOMAH County 1 District - PORTLAND METRO AREA 2024-2027 ADA CURB RAMPS, PHASE 6 (15618)
- Bid Date:
- October 30, 2025
- Project Type(s)
OR MULTNOMAH County 1 District - I-84: (MULTI-USE PATH) JORDAN RD TUNNEL - SANDY RIVER DELTA (15623)
- Bid Date:
- October 30, 2025
- Project Type(s)
11-04-25
ID Benewah County 13109 District - SH-3, MP 59.7 TO MP 70.4 (22291032525)
- Bid Date:
- November 4, 2025
- Project Type(s)
- Description
- SH-3, MP 59.7 TO MP 70.4 For the work of chip seal & fog coat of SH-3 from MP 59.7 to MP 70.4 & SH-6 from MP 34.71 to MP 35.04 & the Santa Y. Sign replacement & delineation throughout project limits. Guardrail installation on bridge Key Numbers 10095 & 10100 at MP 60.52 & MP 62.39 on SH-3.
- Plans:
| Your local Trimble Construction Division dealer |
|---|
| SITECH Northwest |
Loading...