Current Bids
05-19-26
AK Statewide County - Perform seismic retrofits on the following bridges: Edgerton Highway - Copper River (Chitina) #0205, Tonsina River #0288; Old Rich @ Copper Center - Klutina River #0572; Parks Highway - North Slough T (NFHWY00787)
- Bid Date:
- May 19, 2026
- Project Type(s)
- Description
- Perform seismic retrofits on the following bridges: Edgerton Highway - Copper River (Chitina) #0205, Tonsina River #0288; Old Rich @ Copper Center - Klutina River #0572; Parks Highway - North Slough Tanana River #0201, Tanana River at Nenana #0202; Richardson Highway - Tanana River Big Delta #0524, Little Salcha River #0530, Klutina River #1746.
- Plans:
ID Bingham County - For the work of rehabilitating the Bridge to include repairs to the girders, deck, and piers (24339260303)
- Bid Date:
- May 19, 2026
- Project Type(s)
05-20-26
AK Anchorage County - The Contractor shall provide surveying and mapping services in support of the design of this project (25262010)
- Bid Date:
- May 20, 2026
- Project Type(s)
WA BENTON YAKIMA County - SR 241/SR 14 SUNNYSIDE VIC AND COLUMBIA RIVER VIC - WHEEL PATH CHIP SEAL 26Y006 ADDENDA NO (26Y006)
- Bid Date:
- May 20, 2026
- Project Type(s)
| Your local Trimble Construction Division dealer |
|---|
| SITECH Northwest |
| SITECH Northwest |
WA GRANT County - I-90 HANSEN RD OVERPASS EMERGENCY EXISTING STRUCTURE REMOVAL 26Y008 (26Y008)
- Bid Date:
- May 20, 2026
- Project Type(s)
- Description
- I-90 HANSEN RD OVERPASS EMERGENCY EXISTING STRUCTURE REMOVAL 26Y008
- Plans:
WA KING SNOHOMISH County - SR 203 NE 124TH ST TO SKYKOMISH RIVER PAVING WITH EXCEPTIONS 26A003 ADDENDA NO (26A003)
- Bid Date:
- May 20, 2026
- Project Type(s)
WA WHITMAN County - US 195 N FK PALOUSE R WEST WYE EMERGENCY RAIL REPAIR 26Z008 (26Z008)
- Bid Date:
- May 20, 2026
- Project Type(s)
- Description
- US 195 N FK PALOUSE R WEST WYE EMERGENCY RAIL REPAIR 26Z008
- Plans:
05-21-26
AK Statewide County - ADA Improvements to Craig segments 1 & 2 of the Southcoast ADA Audit (SFHWY00377)
- Bid Date:
- May 21, 2026
- Project Type(s)
- Description
- ADA Improvements to Craig segments 1 & 2 of the Southcoast ADA Audit. Approximately 1.8 miles of Water st./Craig/Klawock Hwy between Third Street and Craig High School. Scope of work to include sidewalk, curb ramp, driveway and street crossing improvements consistent with findings in the 2017 Southcoast ADA Audit. STAGE 1- From Third Street to Port Bagial Blvd. To be advertised with Stage 2 as one project.
- Plans:
OR DESCHUTES County - MISCELLANEOUS - DESCHUTES (15667)
- Bid Date:
- May 21, 2026
- Project Type(s)
- Description
- US97: NW GALLOWAY AVE - O'NEIL HWY
- Plans:
| Your local Bobcat dealer |
|---|
| Pape Material Handling |
| Pape Material Handling |
Loading...