ADA Improvements to Craig segments 1 & 2 of the Southcoast ADA Audit
ID - SFHWY00377
ID - SFHWY00377
Location: AK Statewide County
Bid Date/Time: May 27, 2026, 10 p.m.
Project Type:
Status: Active
Description:
ADA Improvements to Craig segments 1 & 2 of the Southcoast ADA Audit. Approximately 1.8 miles of Water st./Craig/Klawock Hwy between Third Street and Craig High School. Scope of work to include sidewalk, curb ramp, driveway and street crossing improvements consistent with findings in the 2017 Southcoast ADA Audit. STAGE 1- From Third Street to Port Bagial Blvd. To be advertised with Stage 2 as one project.
ADA Improvements to Craig segments 1 & 2 of the Southcoast ADA Audit. Approximately 1.8 miles of Water st./Craig/Klawock Hwy between Third Street and Craig High School. Scope of work to include sidewalk, curb ramp, driveway and street crossing improvements consistent with findings in the 2017 Southcoast ADA Audit. STAGE 1- From Third Street to Port Bagial Blvd. To be advertised with Stage 2 as one project.
Project Roles
Owners
- Owner ALASKA DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES, JUNEAU AK 99811
| Your local Trimble Construction Division dealer |
|---|
| SITECH Northwest |
| SITECH Northwest |