We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy. In addition, the California Consumer Privacy Act ("CCPA") provides certain rights with respect to your personal information. Please click here for more information.

  • 3c928384 2acc 4e86 b5fc 48edb8f51a64
    Projects
    By Debra Wood

    Pennsylvania DOT Tackles Major Harrisburg Bottleneck on I-83

  • White house grounds
    By ACP Staff

    White House Releases New $2 Trillion Infrastructure Plan

    Key components of the American Jobs Plan include:

      • $621 billion for transportation, including roads, bridges, transit, ports and airports as well as electrifying vehicles.

    • $111 billion to upgrade drinking and wastewater infrastructure.

    • $100 billion for high-speed broadband infrastructure.

    • $100 billion to upgrade the U.S. power infrastructure.

    • $213 billion to “produce, preserve, and retrofit affordable and sustainable places to live."

    • $137 billion for physical upgrades to public schools, community colleges, child-care facilities, VA hospitals and federal buildings.

    • $300 billion to invest in U.S. manufacturing and strengthen critical supply chains.

    • $100 billion for workforce development and jobs training programs.

    • $400 billion for “expanding access to quality, affordable home- or community-based care for aging relatives and people with disabilities.”

  • Cd3a3e20 bd98 4de1 9af6 608b32534f7f
    Projects
    By Larry Bernstein

    New Christina River Bridge Gives Commuters and Pedestrians From Both Sides Greater Access to Redeveloped Areas

  • 1bac9559 8ed9 43fa a6cc b0a7dbde92bb
    Projects
    By Debra Wood

    Haugland Group Builds COVID-19 Hospital in Record Time

  • D598e658 33d0 4a98 9a76 4f06bca0eea0
    Projects
    By D.L. Anscombe

    Enid A. Haupt Conservatory Restored to Past Grandeur

Trends

  • Monroe Tractor Celebrates 70 Years of Business

  • Getting the Most From Compact Track Loaders

  • Enhancing Safety in the Heavy Equipment Rental Industry

  • Equipment Manufacturers Report Positive Outlook for 2021

  • National Trench Safety to Merge with Trench Plate Rental Company

  • Thorough Accident Investigations Require Seven Steps

  • Employee Engagement Ideas: Where There’s a Will, There’s a Way

  • Using Good Catches to Increase Worker Ownership of Safety

  • LiuGong Recognizes New Jersey Dealer for Partnership Longevity

See More

People

  • 0be19e44 d4ec 4b42 b018 7b93254adaa1

    Curry Supply Appoints Brun as Regional Sales Manager

  • B8269c61 c2fe 469f 81bf 700169a36d4f

    Zugibe Named CEO of Holt Construction Corp.

  • 19521908 35ed 425c 96b0 8e69730ecc26

    Curry Supply Company Hires Wilson as Vice President of Operations

  • A041fa8b 2da5 4965 8e59 1e161aa5f774

    Modjeski and Masters Promotes Engineers Across Firm

  • Holt Construction Corp. Announces New Hires and Internal Promotions

Read More

Projects

  • Fdb5daa7 dd08 4734 b2a4 405128037914

    Stantec Unveils Concept Designs for Battery Coastal Resilience Project in Lower Manhattan

  • New York Governor Announces $48.9M for Clean Water Systems and Local Drinking Water Infrastructure Projects Statewide

  • Df6fae32 f2b4 456b 9500 882e01430081

    Volvo Construction Equipment to Invest $4.3M in North American Training Facility

  • Turner Tops Out The Spiral at 66 Hudson Boulevard

  • Murphy Administration Announces $29M in FY2021 Rail Freight Assistance Program Grants

Read More
  • Smoothride 33
    Sponsored
    By Topcon Solutions Store

    Road Resurfacing Simplified

    Traditionally, highway-resurfacing projects have been a challenge, not only for the contractor, but the inconvenienced community through which the road passes. To collect the project data needed to perform the resurface, typically required lane closures and a team of surveyors collecting data points from along the side of the road with diverted traffic whizzing past.  It was a slow, cumbersome, and dangerous process that affected the daily commuter flow and affected the contractor’s project timeline. But things are getting better. 

  • Smoothride 33
    Sponsored
    By Topcon Solutions Store

    Road Resurfacing Simplified

    Traditionally, highway-resurfacing projects have been a challenge, not only for the contractor, but the inconvenienced community through which the road passes. To collect the project data needed to perform the resurface, typically required lane closures and a team of surveyors collecting data points from along the side of the road with diverted traffic whizzing past.  It was a slow, cumbersome, and dangerous process that affected the daily commuter flow and affected the contractor’s project timeline. But things are getting better. 

Events

  • 20
    Apr

    Webinar: Strategies for Reducing Concrete's Embodied Carbon

  • 22
    Apr

    Tech Talks: Get to Know Telematics

See More
  • Olivina3
    Sponsored
    By Topcon Solutions Store

    Capturing the Past

    “It’s our understanding that the Olivina winery building is a future candidate for a historic restoration, museum, or community center,” stated Ron Oberlander who is with Topcon Positioning Systems, which is headquartered in Livermore. “That’s why we decided to donate our time, expertise, and resources to create thorough architectural documentation of the structure.”

  • Featured Video

    ConExpo-Con/Agg
View More
Select a Region

See stories from other regions.

Select region map Select region map
ACP logo associated construction publications logo
  • About
  • Editorial Calendar
  • Archived Issues
  • Contact Us
  • Subscribe
  • Privacy Policy

Copyright ©2021. All Rights Reserved
Design, CMS, Hosting & Web Development :: ePublishing

Copyright ©2021. All Rights Reserved
Design, CMS, Hosting & Web Development :: ePublishing