Current Bids
05-01-26
MI Berrien County County - Resurfacing - Berrien County (11000-216111)
- Bid Date:
- May 1, 2026
- Project Type(s)
- Description
- 2.58 mi of hot mix asphalt cold milling and resurface and permanent pavement markings on Red Bud Trail from US-12 to Bertand Road, Berrien County. This is a Local Agency project. ** 677 Cb **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-3A. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
- Plans:
MI Berrien County County - Roadside Facilities - Berrien County (11021-215344-2)
- Bid Date:
- May 1, 2026
- Project Type(s)
- Description
- 0.25 mi of hot mix asphalt shared-use path, concrete curb, gutter and ramps, culvert installation and pavement markings along south side of US-12 from the Three Oaks Estates Mobile Home Park to Nells Drive in the village of Three Oaks, Berrien County. This is a Local Agency project. ** 255 Ea or 255 J **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ea and J. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to …
- Plans:
MI Calhoun County County - Resurfacing - Calhoun County (13000-224263)
- Bid Date:
- May 1, 2026
- Project Type(s)
- Description
- 1.80 mi of single chip seal, fog seal, overband crack filling, and permanent pavement markings on Main Street from south village limits to Railroad Street and Jackson Street from the west village limits to Jefferson Street in the village of Tekonsha, Calhoun County. This is a Local Agency project. ** 302 Ca **
- Plans:
MI Chippewa County County - Resurfacing - Chippewa County (17000-215517)
- Bid Date:
- May 1, 2026
- Project Type(s)
| Your local Trimble Construction Division dealer |
|---|
| SITECH Michigan |
MI Dickinson County County - Resurfacing - Dickinson County (22000-225738)
- Bid Date:
- May 1, 2026
- Project Type(s)
- Description
- 4.05 mi of shoulder rehabilitation including widening, hot mix asphalt paving, aggregate shoulder, and permanent pavement markings on Westwood Avenue from Joseph Street northerly to the Kingsford city limit and Pine Mountain Road from the Kingsford city limit northerly to US-2, Dickinson County. This is a Local Agency project. ** 1037 Cb or 1037 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract …
- Plans:
MI Eaton County County - Road Rehabilitation - Eaton County (23000-215983)
- Bid Date:
- May 1, 2026
- Project Type(s)
- Description
- 2.06 mi of hot mix asphalt base crushing and shaping, hot mix asphalt paving, aggregate shoulders, and permanent pavement markings on Holt Highway from Dimondale village limits to Waverly Road, Eaton County. This is a Local Agency project. ** 2078 Cb or 2078 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
- Plans:
MI Hillsdale County County - Installation of flashing border stop signs at various locations, Hillsdale County (30000-221972)
- Bid Date:
- May 1, 2026
- Project Type(s)
MI Huron County, Sanilac County, St Clair County, Tuscola County County - Traffic Operations - Huron County, Sanilac County, St Clair County, Tuscola County (32012-212812)
- Bid Date:
- May 1, 2026
- Project Type(s)
- Description
- 185.42 mi of non-freeway sign upgrading on M-25 from N Reese Road on the Bay/Tuscola County line east and south to Hancock Street/I-69BL, M-29 from Palms Road in Ira Township north to Hancock Street/I-69BL, and I-94BL from I-94 in Marysville east to M-29, St Clair County. ** 2864 N6 **
- Plans: