Bridge reconstruction includes removal and replacement and approach work.
ID - 17072-220528
ID - 17072-220528
Location: MI Chippewa County County 01028 District
Bid Date/Time: Nov. 7, 2025, 3:30 p.m.
Project Type:
Status: Advertised
Description:
Bridge reconstruction includes removal and replacement and approach work. Bridge reconstruction including removal and replacement and approach work on M-129 over Fletcher Creek, Chippewa County. ** 2009 Ea or 2009 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
Bridge reconstruction includes removal and replacement and approach work. Bridge reconstruction including removal and replacement and approach work on M-129 over Fletcher Creek, Chippewa County. ** 2009 Ea or 2009 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
Project Roles
Owners
- Owner MICHIGAN DEPARTMENT OF TRANSPORTATION, 400 TRANSPORTATION LN LANSING MI 48822
| Your local Trimble Construction Division dealer |
|---|
| SITECH Michigan |