Road Rehabilitation - Houghton County
ID - 31000-223204
ID - 31000-223204
Location: MI Houghton County County
Bid Date/Time: April 3, 2026, 2:30 p.m.
Project Type:
Status: Awarded
Description:
3.49 mi of hot mix asphalt base crushing, shaping and resurfacing, culvert replacement, aggregate shoulders, permanent signing, and permanent pavement markings on Otter Lake Road from the Baraga County/Houghton County line to Askel Road and on Askel Road from Otter Lake Road to Tapiola Road, Houghton County. This is a Local Agency project. ** 1760 Cb or 1760 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
3.49 mi of hot mix asphalt base crushing, shaping and resurfacing, culvert replacement, aggregate shoulders, permanent signing, and permanent pavement markings on Otter Lake Road from the Baraga County/Houghton County line to Askel Road and on Askel Road from Otter Lake Road to Tapiola Road, Houghton County. This is a Local Agency project. ** 1760 Cb or 1760 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Project Roles
Owners
- Owner MICHIGAN DEPARTMENT OF TRANSPORTATION, 400 TRANSPORTATION LN LANSING MI 48822
Bidders
- Bidder Bacco Construction Company, - $1,634,820, PO Box 458 Iron Mountain MI 49801
- Bidder Payne & Dolan Inc., - $1,954,572, 801 Clark Dr Gladstone MI 49837
Apparent Low Bidder: Bacco Construction Company
| Your local Trimble Construction Division dealer |
|---|
| SITECH Michigan |