Reconstruction, high friction surface treatment, drainage improvements
ID - 25000-219897
ID - 25000-219897
Location: MI Genesee County County 04015 District
Bid Date/Time: Feb. 6, 2026, 3:30 p.m.
Project Type:
Status: Advertised
Description:
Reconstruction, high friction surface treatment, drainage improvements 0.22 mi of hot mix asphalt reconstruction, high friction surface treatment, drainage improvements, signing and pavement markings on Seymour Road from Whitney Road to south of Ray Road, Genesee County. This is a Local Agency project. ** 445 Cb or 445 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and N7. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Reconstruction, high friction surface treatment, drainage improvements 0.22 mi of hot mix asphalt reconstruction, high friction surface treatment, drainage improvements, signing and pavement markings on Seymour Road from Whitney Road to south of Ray Road, Genesee County. This is a Local Agency project. ** 445 Cb or 445 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and N7. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Project Roles
Owners
- Owner MICHIGAN DEPARTMENT OF TRANSPORTATION, 400 TRANSPORTATION LN LANSING MI 48822
| Your local Deere & Co dealer |
|---|
| AIS Construction Equipment |