Rocky Mountain Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com
September 2026

Jacobs Selected for Critical Utah Water Infrastructure Program

JUAB COUNTY, UT — Jacobs was selected by the Central Utah Water Conservancy District (CUWCD) to provide engineering services for the proposed Strawberry High Line Improvement Project.

The critical water infrastructure program, with an estimated $750 million construction value, is expected to transform the historic Strawberry High Line Canal into a modern, pressurized water system. By replacing the open-water canal with a buried pipeline, the corridor would be repurposed with an integrated regional trail, providing a recreational amenity and improving community connectivity. Additionally, the water conveyance project would serve both agricultural users and growing urban communities across south Utah County and eastern Juab County.

“Modernizing critical water infrastructure is essential to managing community vitality," Jacobs Executive Vice President Tom Meinhart said. "With Utah’s significant growth, the Strawberry High Line Improvement Project would improve system performance delivering water for agriculture, communities, and future development.”

Originally constructed around 1916 as part of the Strawberry Valley Project, the Strawberry High Line Canal conveys water from the Strawberry Reservoir and the Spanish Fork River for agricultural and municipal water uses. In a joint venture with Bowen Collins & Associates, Jacobs is expected to provide design and construction-phase support services to enclose the canal via new pipelines, a pump station, and related infrastructure, supporting water delivery to a future population of approximately 420,000 people.

From rainfall to reuse, Jacobs works across the full water cycle to protect water quality, strengthen resilience, and safeguard the environment. Projects include modernizations at the San José-Santa Clara Regional Wastewater Facility and the Donald C. Tillman Advanced Water Purification Facility, two of the largest and most advanced water reuse projects in the U.S.

Volvo Roadbuilder
Your local Volvo Construction Equipment dealer
Faris Machinery
Faris Machinery